Site Readiness Validation.

Before any material enters the site, we conduct a rigorous 40+ point technical audit. This ensures civil realities match the drawings, eliminating costly rework down the line.

Dimensional Verification

We validate floor levels, ceiling conditions, and wall plumbness. Identifying dimensional drift early prevents hardware misalignment.

Civil Dependencies

We check for concealed conduits, structural support requirements, and readiness of adjacent trades before authorizing deployment.

Drawing Reconciliation

We map site conditions back to the approved shop drawings, ensuring absolute technical conformity before production is locked.

Snag-Mitigated
Execution Workflows.

Installation Readiness Review

Our technical supervisors assess component staging, handling paths, and safety compliance before installation begins. We do not operate on assumptions.

Structured Installation

Execution follows a strict sequential protocol. Hardware is calibrated progressively, and glass is aligned using precision tools, minimizing last-minute adjustments.

60+ Point Post-Installation QC.

We don't wait for the client to find snags. Our internal validation framework ensures the product performs exactly as engineered before the official handover.

Alignment & Clearances

Strict tolerance checks on glass-to-glass and glass-to-wall joints.

Hardware Calibration

Testing hinge closing speeds, lock engagements, and floor spring resistance.

Acoustic & Vibration

Verifying silicone seal integrity and checking for resonance or rattling.

Finish & Aesthetics

Final visual inspection for scratches, profile damage, and cleaning quality.